Glue for the Proofing HyperStone

THE SET OF THE GLUE IS COMPLETED FROM A 15KG OF MORTAR AND B 5KG MILK INGREDIENT.

WE PREPARE THE ADHESIVE PROOFING HYPERSTONE GLUE (1 PART LIQUID AND 3 PARTS MORTAR DURING WINTER AND 1 PART LIQUID AND 2.5 PARTS MORTAR DURING SUMMER).

POUR THE EMULSION IN THE BUCKET AND ADD THE MORTAR WHILE STIRRING IT WITH A SLOW-REVOLVING DRILL FOR 5 MINUTES. WE LET IT REST FOR 5 MINUTES AND RE-STIR IT FOR 2 MINUTES.

THE QUANTITY PREPARED INSIDE THE BUCKET WILL LAST FOR UP TO 5 HOURS.

USE A 5MM (HALF CENTIMETER) SERRATED SPATULA ON ANY SURFACE.

AFTER SPREADING THE GLUE ON THE WALL, THE TIME AVAILABLE TO INSTALL THE PROOFING HYPERSTONE ROCK RANGES BETWEEN 5 AND 15 MINUTES, DEPENDING ON THE WEATHER CONDITIONS.